HomeNewsPhotos

Photos

Building 500 prepped for SACCS mission
William Bach wheels ceiling tiles to a dumpster as part of a renovation project to relocate the Strategic Automated Command and Control System into building 500 Feb. 25.

Download Image: Full Size (4.33 MB)
Tags:
Photo by: Tech. Sgt. William A. O'Brien |  VIRIN: 200226-F-OH250-1153.JPG