Art

Keyword: Category: Tag: Sort By:
Airmen from the 7th Bomb Wing man the Deployment Control Center processing line Feb. 23, 2016, at Dyess Air Force Base, Texas, during a B-1 Combat Mission Effectiveness exercise. The DCC is a one-stop shop for Airmen issued a short-notice deployment tasking to ensure they are fully qualified to deploy. Part of the plan for the B-1 CME exercise was to task Airmen in operations, maintenance and support positions to deploy within 48 hours. (U.S. Air Force photo by Airman 1st Class Austin Mayfield/Released)


Lancers execute first-ever Block 16 long-range strike exercise

Airmen from the 7th Bomb Wing man the Deployment Control Center processing line Feb. 23, 2016, at Dyess Air Force Base, Texas, during a B-1 Combat Mission Effectiveness exercise. The DCC is a one-stop shop for Airmen issued a short-notice deployment tasking to ensure they are fully qualified to deploy. Part of the plan for the B-1 CME exercise was to task Airmen in operations, maintenance and support positions to deploy within 48 hours. (U.S. Air Force photo by Airman 1st Class Austin Mayfield/Released)

Related Imagery
Airman 1st Class Austin Mayfield
160223-F-IE661-028.JPG

DOWNLOAD PHOTO
(0.42 MB MB)



Tags
Airmen, B-1, Airman, B-1 Lancer, B-1 Lancer, B-1 bomber



< Back to Main Gallery